Harvest Bible Chapel

225 E. Exchange, Spring Lake
Spring Lake, Michigan

This expansion and renovation, touched almost every area within the Harvest Bible Chapel.  Significant changes to the building were expanding the narthex to the west roof line and replacing the existing window wall of the narthex to increase natural lighting. The existing church required a detailed understanding of the existing conditions in order to streamline its energy use and achieve an efficient building. Seating for 775 people was installed in the nave along with a renovated chancel and new baptismal font and Green Room.  The Church’s original chapel space was refurbished to serve as the fellowship and gathering space for the congregation. The new design created expanded areas specific to the children’s religious development.  Different age groups from toddler through high school age utilize spaces dedicated to their activities and religious development.

55,000.0 SQ FT
Adaptive ReuseFood and Beverage ProcessingWorshipDesign Build

Contributors

  • Dan Vos Construction Co.

    Dan Vos Construction Co.

  • Classic Engineering

    Classic Engineering

  • Steel Systems Inc

    Steel Systems Inc

  • Pleune Service Company

    Pleune Service Company